Additional Operations
Agway can provide you a customized material through its fabrication, punching and bending operations. Should your project material require perforations, punching, vertical or bubble ribs, SPV coating or cross breaking, Agway can deliver exactly what you need.
Resources
Available on 29/26/24 ga. Metal Flashings
Perforations
- Holes – 3/4” holes on 2” or 4” centres in 1, 2 or 3 Rows
- Slots – 1/8” x 1” slots in 1, 2 or 3 Rows to a max. length of 144”
- NOTE: 1 row of Slotted Perforations @ 240 slots/row gives the same amount of ventilation as either 2 rows of 3/4” holes on 4” centres or 1 row of 3/4” holes on 2” centres
Fly Screens
- 2” – 5” wide can be installed in any Vented Soffit
Punching (Minimum run size 50 pcs.)
- Maximum length: 12′ 0″
- Hole diameters from 1/8″ to 1″ in 1/16″ increments
- Holes on 1 1/4″ centres
- In 1, 2 or 3 rows
Ribs
- Bubble Rib or V-Rib
- Maximum length: Bubble Rib: 10’ – 0” V-Rib: 20’ – 2”
- Rib Depth: Bubble Rib: 1/2” V-Rib: 1/2”
SPV Coating
- Application of protective plastic coating to flat sheets
- Available for 48″ lengths
Break Corner Box To Roofline
- From Corner box to roof pitch on gable side of building
Brake Forming
- Up to 20’ long in most shapes
Crossbreaking
- A brake-formed cross added as stiffening to large flat surfaces of flashing
Custom Trim Bend Examples
“S” Lock
- Girth up to 48”
Swaging
- Maximum thickness: 22 Gauge